California contractor license: CSLB #1130984
Contact: office@callthepinkguy.com
Encino: 18034 Ventura Blvd #242, Encino, CA 91316
Springfield: 2733 E Battlefield Rd #169, Springfield, MO 65804
On this page
- Construction contract
- Right to cancel
- CSLB Information
- Missouri: Right to cancel
- 1. Terms and Conditions
- 2. Approving your quote
- 3. Your quote and project records
- 4. Your signed documents and consumer rights
- 5. Payments, change orders and return visits
- 6. Site access, coordination and protection
- 7. Our team, equipment and materials
- 8. Completion, cleanup and warranties
- 9. Photos, privacy and confidential information
- 10. Liability and Dispute Resolution
Construction contract
Consumer Notice: You are entitled to a completely filled in copy of this agreement, signed by both you and the contractor, before any work may be started.
Right to cancel
For covered California home improvement contracts, the cancellation period is generally three business days. It is five business days when the buyer is age 65 or older, and a seven-business-day period may apply to qualifying disaster-related repairs. Follow the applicable notice and cancellation form provided with your signed California contract. This summary does not replace those documents or limit any cancellation rights.
CSLB Information
CSLB HEADQUARTERS CONTACT INFORMATION Mailing Address: P.O. Box 26000, Sacramento CA 95826-0026 Street Address: 9821 Business Park Drive, Sacramento CA 95827-1703 Licensing Fax: (916) 366-9130
Missouri: Right to cancel
If your project is covered by Missouri’s home solicitation sales law, you may cancel by giving written notice to the seller at the address shown in your agreement by midnight on the third business day after you sign. For this Missouri rule, Saturdays, Sundays, and legal holidays do not count. This rule applies to qualifying consumer credit sales personally solicited and agreed to at the buyer’s residence. It does not apply to every Missouri project.
For qualifying exterior work to be paid under property and casualty insurance, a separate Missouri rule may allow cancellation through the fifth business day after you receive written notice that the insurer will not cover all or part of the claim or contract. Federal cancellation rights may also apply. Follow the notices and forms provided with your signed contract. These summaries do not replace any required notice or limit your cancellation rights.
1. Terms and Conditions
These standard service terms apply to a project only if the signed project agreement expressly incorporates them. The signed project agreement, later signed change orders, and applicable law control if anything differs. A request, site visit or website inquiry does not authorize work. Nothing here limits a statutory right or remedy.
Scope, access and coordination
The written project agreement identifies the surfaces, finish systems, preparation, protection, quantities, exclusions, schedule, and price. Please make the agreed work areas available and provide reasonable access, utilities and parking arrangements as stated in the agreement. The client or designated general contractor coordinates other trades, provides timely decisions, and keeps finished surfaces protected. We control our work methods and staffing and may use qualified subcontractors as allowed by the agreement and applicable law. We will communicate changes in access or sequencing and their impact on the schedule.
Existing conditions and finish expectations
Our price is based on visible conditions and the preparation listed in the scope. Hidden defects, widespread coating adhesion failure, unstable substrates, or damage by others may require additional preparation or repair. We will document the issue and obtain a written, signed change order before performing extra work. We use reasonable protection when taping near surfaces finished by others and will flag conditions that pose a risk.
Decorative finishes: limewash, Venetian plaster, Roman clay, and other decorative finishes.
Natural variations in tone, texture, and movement are expected. Your signed agreement identifies the approved sample or mockup and any specific Painting Contractors Association (PCA) standard that applies.
Limewash is a mineral coating with a soft, matte, often mottled appearance. Venetian plaster is a thin, troweled plaster finish that can be burnished to a smooth sheen. Roman clay is a troweled decorative finish with a soft, matte surface and subtle movement.
PDCA Guidelines/ Standards
Please see the attached standards from the Painting Decorating Contractor association as their standards will be used when determining, but not limited to the following common examples:
https://pcapainted.org/wp-content/uploads/2019/05/PDCA-Standards-May28-2019.pdf
PDCA Standard P1 establishes criteria for determining a properly painted surface, defines touch up and repair, and determines which party to an agreement should bear the financial responsibility for such work
5.3 The acceptability of the surface shall be determined when viewed without magnification, at a distance of thirty-nine (39) inches or one (1) meter or more, under finished lighting conditions and from a normal viewing position.
2.1 This standard defines the repair and repainting of finished painted surfaces that have been damaged by individuals other than those employed by the painting and decorating contractor. This type of damage is defined as “damage caused by others.” Damage caused by others will be corrected by the painting and decorating contractor after a change order is received from the contracting entity.
PDCA Standard P3: This standard explains how adding more paint colors and finishes can affect the cost and time needed for a project. It offers guidance when the number of colors or their placement isn’t clearly mentioned in the project documents.
2.1The number and placement of paint colors and color ranges affect the painting and decorating contractor’s costs in the performance of a project and, therefore, the painting contractor’s bid. As the number and placement of paint colors increase, labor productivity decreases. As paint colors deepen, painting material costs increase.
2.2. The number and placement of paint colors and color ranges must be indicated in the project bid documents.
PDCA Standard P7: This standard details the order in which different teams should work on a construction project to ensure efficient and smooth painting and decorating work, including the cost impact of any changes.
The following requirements are mandatory for proper sequencing of the painting and decorating contractor’s scope of work:
5.3.1. When the work of the painting and decorating contractor is impacted by the work of other trades, job sequencing shall be maintained enabling the painting and decorating contractor to commence its work and proceed efficiently through to completion.
5.3.2. The painting and decorating contractor shall be informed in writing not less than three (3) working days in advance of changes in schedule that may affect work shifts, require acceleration, or cause added cost.
5.3.3. Completion of other trades’ work that requires field finishing is to be coordinated with the painting and decorating contractor to avoid adverse conditions such as leap-frogging, stacking of trades and damage by others to finishes, whether completed or in progress. separately as described in
Read the PCA industry standards (P1, P3 and P7). These standards apply only where stated in the signed scope; the approved sample or mockup sets the appearance expectations for decorative finishes.
Changes, payments and closeout
Changes to the scope, price or timing are documented in writing and signed before the added work begins. Materials and any other charges are listed separately in the written change order. The deposit, progress payments, retention if applicable, and final payment follow the written project schedule and applicable law. At completion, we will review the work and agree on any remaining touch-ups. The work area will be swept or vacuumed as appropriate; deep or professional cleaning is excluded unless listed. Report concerns promptly so we can inspect them; this does not shorten a warranty or legal right.
Workmanship, product issues and project photos
The Pink Guy Inc. provides a one-year workmanship warranty from completion on all projects, subject to applicable law. If a finish fails due to our workmanship, we will inspect and address it under that warranty. Manufacturer and customer-supplied product issues are handled under the applicable warranty and project agreement; repairs outside our workmanship warranty are quoted separately. We may document the job for quality, records, or warranty. Project photography and its use are governed by Section 9, Photos, privacy and confidential information.
Questions, records and delays
Contact office@callthepinkguy.com with concerns about your project. We will review the facts and try to resolve the issue directly. Liability and dispute resolution are addressed in Section 10 and are subject to applicable law. Each party should protect confidential information as agreed or legally required. If a material delay or event outside reasonable control occurs, notify the other party and document the effect on the project. These terms do not add an arbitration requirement or waive statutory rights.
2. Approving your quote
Before approving your quote, review it, the scope of work, any attached agreements and notices, and these Terms and Conditions. By signing or approving a quote that incorporates these Terms and Conditions, you agree to the work, price, and payment schedule stated in your signed project agreement, along with these terms.
3. Your quote and project records
Your project agreement consists of your signed quote and signed scope of work. It describes the work we’ll do, what’s excluded, the price, payment schedule, and project timing. It also includes the warranty details and any notices that apply to your project. Please keep a copy of your signed agreement, these Terms and Conditions, and any signed change orders for your records.
4. Your signed documents and consumer rights
Your project agreement consists of your signed quote and signed scope of work. The Pink Guy Inc. performs the work described in those documents. The agreement identifies the parties and property, the surfaces and materials included, exclusions, price, payment schedule, expected start and completion timing, and any warranty or notices for your job. Review the completed agreement and keep a signed copy before work begins.
For California projects, our contractor license is CSLB #1130984. Your agreement will include any required contractor notices, lien notices, and cancellation notice or form that apply to your project. If you have the right to cancel, follow the instructions in the applicable notice. These terms do not shorten your cancellation period or limit any right or remedy under applicable law.
5. Payments, change orders and return visits
Time of the Essence
The Client and the Contractor will do everything reasonable to keep the project on schedule, however both the Client and the Contractor understand that during these uncertain times, delays may occur and will endeavor to be reasonable in their understanding of the other.
Pay the deposit, progress invoices, and final invoice when due under your signed agreement. Any deposit is subject to applicable legal limits. Your agreement sets the progress milestones, the amounts due, and when any amount held back is released, if your agreement provides for one. Any agreed fees must be stated in the signed agreement and apply only as allowed by law.
Our standard progress payment schedule is 10% down, three progress payments of 30%, 30%, and 20% at the agreed milestones, and 10% at completion. Your signed quote may set a different schedule and specifies the dollar amount and due date or milestone for each payment. Any down payment is credited toward the contract price. For covered California home improvement contracts, the down payment cannot exceed 10% of the contract price or $1,000, whichever is less. Progress payments for those contracts are tied to work performed or materials delivered. If the down payment is reduced, the signed quote allocates the difference to later payments so the schedule totals 100%.
Either of us may request a change. Before extra work starts, we will put the change in writing, explain the added or removed work and any price or timing impact, and have both you and The Pink Guy Inc. sign the change order. If a requested change prevents us from continuing the scheduled work, The Pink Guy Inc. may pause the affected work until both parties sign the change order. The change order sets the agreed fixed price or hourly basis and lists materials or other charges separately.
Labor rates per technician
Standard painting: $110 per hour or $880 for an eight-hour day.
Decorative finishes and architectural plaster: $150 per hour or $1,200 for an eight-hour day.
Visits shorter than eight hours are billed hourly.
If another trade damages completed work, or a change in scope or sequencing requires us to return, we will document the condition and agree on the work, price, and timing in a written change order before proceeding. Work needed to correct our own workmanship is handled separately under the applicable agreement and warranty.
6. Site access, coordination and protection
Client responsibilities
Provide information in a timely manner
Pay invoices according to the payment schedule in your signed quote.
Provide uninterrupted access to the location of the work to be completed
Provide power and utilities necessary for completing the work. Provide parking or compensation for parking during the construction period for any and all vehicles required. If a parking structure is required, client will pay for any applicable fees associated with daily parking rates.
Site conditions and surface protection
Ceiling repaint - Tape Damage on Walls Painted by Others. While in the process of painting the ceiling, tape may/will need to be placed on pre-painted walls. If The Pink Guy Inc is not painting the walls at the same time, The Pink Guy Inc is not liable to repair or mitigate any accidental removal of paint from the walls while removing/ installing masking tape. This is due to the fact that pre-existing surface preparation underneath the paint are pre-existing conditions unknown and uncontrollable to The Pink Guy Inc.
Cabinet refinishing - Tape Damage to Walls Painted by Others. While in the process of refinishing cabinets, we will be required to apply masking tape to the adjacent wall surface previously painted. If we The Pink Guy Inc are not painting the walls at the same time as the cabinets, we are not liable for repair or to mitigate any accidental removal of the paint from the walls when removing the masking tape. This is due to the fact that pre-existing surface preparation underneath the paint are pre-existing conditions unknown and uncontrollable to The Pink Guy Inc.
General Repainting - Tape Damage to Hardwood / Laminate flooring. In the process or perforation, we will be required to place tape onto the flooring surface. The Pink Guy Inc, is not liable for any accidental removal of stain / sealant/ wax coating as the pre-existing conditions are unknown to the Pink Guy Inc.
For the above conditions, industry standard masking tape, processes and procedures are followed to ensure minimal damage at all times. The Pink Guy Inc. is not responsible for pre-existing conditions.
If you manage the project without a general contractor
If you the individual are self managing your project, and there is no project manager, or General Contractor involved, you are assuming the role and knowledge that would be had by the appropriate manager. You assume responsibility for possessing knowledge of coordinating trades, timelines, and are responsible for delays or damages by other trades, and post construction cleanup.
As finishers, if we have to come back and touch up any of the walls, trim, or work that we have done, because another trade created damage, or had their scope of work changed, we will bill for the return visit at the applicable rate in Section 5, as stated in a change order signed before the extra work begins. It is the project managers responsibility to manage all trades, to ensure that no damage is occurring once finished work is complete.
7. Our team, equipment and materials
Capacity/ Independent Contractor
1. In providing the services under this agreement, it is expressly agreed that the Contractor is acting as an Independent Contractor and not as an employee. The Contractor and the Client acknowledge that this Agreement does not create a partnership or joint venture between them and is exclusively a contract for service.
Right of Substitution
1. Except as otherwise provided in this Agreement, the Contractor may, at the Contractor’s absolute discretion, engage a third-party Subcontractor to perform some (or all) of the obligations of the Contractor under this Agreement and the Client will not hire or engage any third parties to assist with the provision of the Services (unless indicated within this Agreement).
2. If the Contractor hires a Subcontractor: The Contractor will pay the Subcontractor for its services and the Compensations will remain payable by the Client to the Contractor.
3. For the purposes of the indemnification clause of this agreement, the Sub-Contractor is an agent of the Contractor and has full discretion of selection of subcontractors.
Autonomy
1. Except as otherwise provided in this agreement, the Contractor will have full control over work time, methods, and decision making in relation to provision of the Services in accordance with the Agreement. The Contractor will work autonomously and not at the direction of the Client. However, the Contractor will be responsive to the reasonable needs and concerns of the Client The Recipient's only concern is the result of the Contractor's work, and not the means of accomplishing it. Except in extraordinary circumstances and when necessary, the Contractor shall perform the Services without direct supervision by the Recipient.
Professional Capacity
1. The Contractor is a professional who uses its own professional and business methods to perform services. The Contractor has not and will not receive training from the Recipient regarding how to perform the Services.
No set work hours
The Contractor has no set hours of work. There is no requirement that the Contractor work full time or otherwise account for work hours
Please route requests that affect our work through the designated project contact. Do not direct our crew or bring another contractor into our scope without prior agreement.
Equipment
1. Except as otherwise provided in this Agreement the Contractor will provide all tools, machinery, equipment, necessary to deliver the Services in accordance with the agreement.
2. All job specific raw materials and supplies, task specific workwear and any other items or parts required to complete the Services outlined in this Agreement will be compensated to the Contractor by the client.
Your signed quote and scope identify included job-specific items. Any additional charge for items outside the agreed scope must be listed in a signed change order.
8. Completion, cleanup and warranties
Completion Criteria
Contractor shall have fulfilled its obligations when the following occurs:
Contractor delivers the terms outlined in the section entitled “Description” and accomplishes what is outlined in “Contractor Responsibilities”
The Contractor has reached substantial completion – as defined by the space being used by the client for its intended purpose, excluding any deficiencies, which the Contractor may remedy in a timely manner.
Deficiencies will be submitted to the contractor in writing.
Clients have 48 hours from handover to report deficiencies to the contractor.
The 48-hour reporting window applies to visible punch-list items and does not shorten the one-year workmanship warranty or limit any legal right.
Work is substantially complete when the agreed scope is ready for its intended use, even if minor touch-ups remain. At the walkthrough, we’ll record agreed touch-ups in a written list and confirm the next steps. The walkthrough does not limit any warranty or legal right.
Cleaning expectation:
It is understood that post all construction projects, professional cleaning services may be required. We will sweep and vacuum the site, but will not deep clean. The client understands we are not professional cleaners, so the client should plan on hiring a cleaning service to come in after the work has finished. We will not wet mop, deep clean, scrub or provide any cleaning services beyond broom sweeping and vacuuming where the work was performed.
Construction cleanup may be an increased cost compared to a regular maintenance cleaning. By agreeing to this contract you waive the right to pursue cleaning charges as we do not include those services for construction sites.
The Pink Guy Inc. provides a one-year workmanship warranty from completion on all projects. Your signed agreement describes the scope and any exclusions, subject to applicable law. If you raise a workmanship concern during the applicable warranty period, contact us so we can inspect the issue and address covered work. Product defects are handled under any applicable manufacturer warranty and the project agreement. We can help identify the appropriate next step; whether replacement labor is covered or separately chargeable depends on the agreement and the cause of the issue. Our workmanship obligations remain separate from the performance of products you supply.
9. Photos, privacy and confidential information
By signing your project agreement, you authorize The Pink Guy Inc. to photograph, record, and document our work during and after the project. We may use those images and recordings for internal records, quality control, and warranty purposes, and publish them in our portfolio and marketing materials without further approval. Upon request, you agree to provide The Pink Guy Inc. with access to the project site to photograph the completed work.
Confidentiality
Contractor may have had access to proprietary, private and/or otherwise . confidential information ("Confidential Information") of the Recipient. Confidential Information shall mean all non-public information which constitutes, relates or refers to the operation of the business of the Recipient, including without limitation, all financial, investment, operational, personnel, sales, marketing, managerial and statistical information of the Recipient, and any and all trade secrets, customer lists, or pricing information of the Recipient. The nature of the information and the manner of disclosure are such that a reasonable person would understand it to be confidential. The Contractor will not at any time or in any manner, either directly or indirectly, use for the personal benefit of the Contractor, or divulge, disclose, or communicate in any manner any Confidential Information. The Contractor will protect such information and treat the Confidential Information as strictly confidential. This provision shall continue to be effective after the termination of this Agreement. Upon termination of this Agreement, the Contractor will return to the Recipient all Confidential Information, whether physical or electronic, and other items that were used, created, or controlled by the Contractor during the term of this Agreement.
The Pink Guy Inc. may retain records reasonably necessary for warranty, legal, or business recordkeeping. Any retained confidential information remains subject to this clause.
10. Liability and Dispute Resolution
Force Majeure
Neither the client nor The Pink Guy Inc. is responsible for delay in obligations actually affected by events beyond their reasonable control, including severe weather, natural disasters, strikes, or government orders. The affected party will notify the other promptly, take reasonable steps to reduce the delay, and resume performance as soon as reasonably possible. We will confirm any revised schedule in writing. This does not excuse amounts already due for properly performed work or limit any right or remedy that cannot lawfully be limited.
Dispute Resolution
Please send written notice of a concern to office@callthepinkguy.com describing the issue and the outcome you are requesting. Both parties will try in good faith to resolve it directly. If it remains unresolved 30 days after written notice, either party may propose mediation with a mutually agreed neutral mediator. If both parties agree to mediate, they will aim to meet within 60 days of the request. Neither discussion nor mediation is a prerequisite to using an available legal remedy, making a regulatory complaint, requesting emergency relief, preserving lien rights, or meeting a legal deadline. Arbitration is not required.
Nothing in this section requires The Pink Guy Inc. to delay or forgo any notice, filing, or action necessary to preserve or enforce its mechanics lien rights.
Indemnification and work by others
The Pink Guy Inc. is responsible for its own work and for work performed on its behalf. We are not responsible for loss or damage to the extent caused by the client or by contractors, vendors, or agents retained separately by the client. To the extent permitted by law, the client agrees to indemnify The Pink Guy Inc. against third-party claims and reasonable expenses only to the extent caused by the negligence or wrongdoing of the client or those acting on the client’s behalf. This does not require the client to indemnify us for our own negligence, wrongdoing, or breach, or for the conduct of anyone we hire to perform our work.
Limitation of Liability
Nothing in these terms limits liability for fraud, gross negligence, willful misconduct, or any other liability that cannot lawfully be limited. These terms do not limit your workmanship warranty, statutory rights, or remedies that applicable law protects.
Attorneys’ Fees
Each party is responsible for its own legal fees and expenses unless applicable law provides otherwise or a court awards fees or costs as authorized by law.